More than 100 years
serving the industry
Life solutions
Energy solutions
Focus on
Our News
ACHEMA 2024
The ACHEMA trade fair is an event that attracts the attention of professionals, entrepreneurs, and innovators from the
OUR SOLUTIONS
For your markets and industries
Food
& Ingredients
Food
& ingredients
Discover
Brewery &
Distillery
Brewery &
Distillery
Discover
Cosmetics
& Hygiene
Cosmetics
& Hygiene
Discover
Pharma & Biotech
Pharma & Biotech
Discover
Energy
Nuclear
Energy
Nuclear
Discover
News
Energies
News
Energies
Discover
Oil
& Gaz
Oil
& Gaz
Discover
Steel
& Mining
Steel
& Mining
Discover
Your projects
Our Achievements
Complete technological system for water filtration in a food processing plant
In response to changes in sanitary standards, we intervened in our client’s plant to regulate its equipment rinsing system and the filtration of the water used.
Lucciana EDF PEI power station in Corsica – EPC project
On this large scale project, Boccard’s teams were responsible for the EPC including the electromechanical aspects of the new diesel power plant. The plant integrates tarpaulins, framework, piping, electricity and equipment assembly.
Studies of cooling circuits as part of the refurbishment of the B Arcelor Mittal blast furnace in Ghent, Belgium.
ArcelorMittal in Ghent has 2 blast furnaces which are the heart of their production The blast furnaces operate for 20 to 25 years, after which the refractory lining must be renewed. Today it is the turn of blast furnace B to undergo such an operation.